Set Up Technician 2nd Shift

Website Celerity Staffing Solutions

Setup tech must have good understanding of mold function.  Set up mold into press. (Including water, hydraulic and electrical)  Test connections, water flow, hydraulic, and electrical prior to start up.  Match proper nozzle (clean nozzle body) and connect DME units when needed.  Set up machine/mold parameters according to setup sheet.  Bring and set up auxiliary equipment to work station as required.  Inform the Process Tech and/or Supervisor if you encounter problems with a set-up.  Set up conveyor, bins at machine to insure proper removal of parts.  Spray molds prior to storage to prevent mold damage.  Clean and organize area around machine after set-up is completed.  Clean press platens between mold changes.  Operate and understand press controls.  Fill out mold and machine maintenance request forms and tags. (Press and auxiliary)  Make sure to include defective parts with mold repair request.  Clean loaders, filters, and hoses on the machine before beginning a mold change.  Complete all required documentation for set-up.  Perform any additional tasks as requested by your supervisor.  Assist when necessary in the cleaning and placement of dryers and grinders to ensure that they are in place and functional prior to starting up the press.  Ensure that the grinders and loaders are set up to consume regrind material whenever possible.  Breaks and/or lunches cannot coincide with another set up technician- there must be technical staff on the floor at all times  Ensure part weight and color percentage matches work order and then is documented on form provided.

2nd shift 3pm-11pm

To apply for this job email your details to shawano@celeritystaffing.com